Appendix A



Selected Provisions of the Energy Policy Act of 1992
(Public Law 102-486), Title VII--Electricity



Subtitle A--Exempt Wholesale Generators

SEC. 711. PUBLIC UTILITY HOLDING COMPANY ACT REFORM.


The Public Utility Holding Company Act of 1935 (15 U.S.C. 79 and following) is amended by redesignating sections 32 and 33 as sections 34 and 35 respectively and by adding the following new section after section 31:


"SEC. 32. EXEMPT WHOLESALE GENERATORS.


"(a) DEFINITIONS.--For purposes of this section--

"(1) EXEMPT WHOLESALE GENERATOR.--The term 'exempt wholesale generator' means any person determined by the Federal Energy Regulatory Commission to be engaged directly, or indirectly through one or more affiliates as defined in section 2(a)(11)(B), and exclusively in the business of owning or operating, or both owning and operating, all or part of one or more eligible facilities and selling electric energy at wholesale. No person shall be deemed to be an exempt wholesale generator under this section unless such person has applied to the Federal Energy Regulatory Commission for a determination under this paragraph. A person applying in good faith for such a determination shall be deemed an exempt wholesale generator under this section, with all of the exemptions provided by this section, until the Federal Energy Regulatory Commission makes such determination. The Federal Energy Regulatory Commission shall make such determination within 60 days of its receipt of such application and shall notify the Commission whenever a determination is made under this paragraph that any person is an exempt wholesale generator. Not later than 12 months after the date of enactment of this section, the Federal Energy Regulatory Commission shall promulgate rules implementing the provisions of this paragraph. Applications for determination filed after the effective date of such rules shall be subject thereto.

"(2) ELIGIBLE FACILITY.--The term 'eligible facility' means a facility, wherever located, which is either--

"(A) used for the generation of electric energy exclusively for sale at wholesale, or

"(B) used for the generation of electric energy and leased to one or more public utility companies; Provided, That any such lease shall be treated as a sale of electric energy at wholesale for purposes of sections 205 and 206 of the Federal Power Act.

Such term shall not include any facility for which consent is required under subsection (c) if such consent has not been obtained. Such term includes interconnecting transmission facilities necessary to effect a sale of electric energy at wholesale. For purposes of this paragraph the term 'facility' may include a portion of a facility subject to the limitations of subsection (d) and shall include a facility the construction of which has not been commenced or completed.

"(3) SALE OF ELECTRIC ENERGY AT WHOLESALE.--The term 'sale of electric energy at wholesale' shall have the same meaning as provided in section 201(d) of the Federal Power Act (16 U.S.C. 824(d)).

"(4) RETAIL RATES AND CHARGES.--The term 'retail rates and charges' means rates and charges for the sale of electric energy directly to consumers.

"(b) FOREIGN RETAIL SALES.--Notwithstanding paragraphs (1) and (2) of subsection (a), retail sales of electric energy produced by a facility located in a foreign country shall not prevent such facility from being an eligible facility, or prevent a person owning or operating, or both owning and operating, such facility from being an exempt wholesale generator if none of the electric energy generated by such facility is sold to consumers in the United States.

"(c) STATE CONSENT FOR EXISTING RATE-BASED FACILITIES.-- If a rate or charge for, or in connection with, the construction of a facility, or for electric energy produced by a facility (other than any portion of a rate or charge which represents recovery of the cost of a wholesale rate or charge) was in effect under the laws of any State as of the date of enactment of this section, in order for the facility to be considered an eligible facility, every State commission having jurisdiction over any such rate or charge must make a specific determination that allowing such facility to be an eligible facility (1) will benefit consumers, (2) is in the public interest, and (3) does not violate State law; Provided, That in the case of such a rate or charge which is a rate or charge of an affiliate of a registered holding company:

"(A) such determination with respect to the facility in question shall be required from every State commission having jurisdiction over the retail rates and charges of the affiliates of such registered holding company; and

"(B) the approval of the Commission under this Act shall not be required for the transfer of the facility to an exempt wholesale generator.

"(d) HYBRIDS.--(1) No exempt wholesale generator may own or operate a portion of any facility if any other portion of the facility is owned or operated by an electric utility company that is an affiliate or associate company of such exempt wholesale generator.

"(2) ELIGIBLE FACILITY.--Notwithstanding paragraph (1), an exempt wholesale generator may own or operate a portion of a facility identified in paragraph (1) if such portion has become an eligible facility as a result of the operation of subsection (c).

"(e) EXEMPTION OF EWGS.--An exempt wholesale generator shall not be considered an electric utility company under section 2(a)(3) of this Act and, whether or not a subsidiary company, an affiliate, or an associate company of a holding company, an exempt wholesale generator shall be exempt from all provisions of this Act.

"(f) OWNERSHIP OF EWGS BY EXEMPT HOLDING COMPANIES.-- Notwithstanding any provision of this Act, a holding company that is exempt under section 3 of this Act shall be permitted, without condition or limitation under this Act, to acquire and maintain an interest in the business of one or more exempt wholesale generators.

"(g) OWNERSHIP OF EWGS BY REGISTERED HOLDING COMPANIES.-- Notwithstanding any provision of this Act and the Commission's jurisdiction as provided under subsection (h) of this section, a registered holding company shall be permitted (without the need to apply for, or receive, approval from the Commission, and otherwise without condition under this Act) to acquire and hold the securities, or an interest in the business, of one or more exempt wholesale generators.

"(h) FINANCING AND OTHER RELATIONSHIPS BETWEEN EWGS AND REGISTERED HOLDING COMPANIES.--The issuance of securities by a registered holding company for purposes of financing the acquisition of an exempt wholesale generator, the guarantee of securities of an exempt wholesale generator by a registered holding company, the entering into service, sales or construction contracts, and the creation or maintenance of any other relationship in addition to that described in subsection (g) between an exempt wholesale generator and a registered holding company, its affiliates and associate companies, shall remain subject to the jurisdiction of the Commission under this Act: Provided, That--

"(1) section 11 of this Act shall not prohibit the ownership of an interest in the business of one or more exempt wholesale generators by a registered holding company (regardless of where facilities owned or operated by such exempt wholesale generators are located), and such ownership by a registered holding company shall be deemed consistent with the operation of an integrated public utility system;

"(2) the ownership of an interest in the business of one or more exempt wholesale generators by a registered holding company (regardless of where facilities owned or operated by such exempt wholesale generators are located) shall be considered as reasonably incidental, or economically necessary or appropriate, to the operations of an integrated public utility system;

"(3) in determining whether to approve (A) the issue or sale of a security by a registered holding company for purposes of financing the acquisition of an exempt wholesale generator, or (B) the guarantee of a security of an exempt wholesale generator by a registered holding company, the Commission shall not make a finding that such security is not reasonably adapted to the earning power of such company or to the security structure of such company and other companies in the same holding company system, or that the circumstances are such as to constitute the making of such guarantee an improper risk for such company, unless the Commission first finds that the issue or sale of such security, or the making of the guarantee, would have a substantial adverse impact on the financial integrity of the registered holding company system;

"(4) in determining whether to approve (A) the issue or sale of a security by a registered holding company for purposes other than the acquisition of an exempt wholesale generator or (B) other transactions by such registered holding company or by its subsidiaries other than with respect to exempt wholesale generators, the Commission shall not consider the effect of the capitalization or earnings of any subsidiary which is an exempt wholesale generator upon the registered holding company system, unless the approval of the issue or sale or other transaction, together with the effect of such capitalization and earnings, would have a substantial adverse impact on the financial integrity of the registered holding company system;

"(5) the Commission shall make its decision under paragraph (3) to approve or disapprove the issue or sale of a security or the guarantee of a security within 120 days of the filing of a declaration concerning such issue, sale or guarantee; and

"(6) the Commission shall promulgate regulations with respect to the actions which would be considered, for purposes of this subsection, to have a substantial adverse impact on the financial integrity of the registered holding company system; such regulations shall ensure that the action has no adverse impact on any utility subsidiary or its customers, or on the ability of State commissions to protect such subsidiary or customers, and shall take into account the amount and type of capital invested in exempt wholesale generators, the ratio of such capital to the total capital invested in utility operations, the availability of books and records, and the financial and operating experience of the registered holding company and the exempt wholesale generator; the Commission shall promulgate such regulations within 6 months after the enactment of this section, after such 6-month period the Commission shall not approve any actions under paragraph (3), (4) or (5) except in accordance with such issued regulations.

"(i) APPLICATION OF ACT TO OTHER ELIGIBLE FACILITIES.--In the case of any person engaged directly and exclusively in the business of owning or operating (or both owning and operating) all or part of one or more eligible facilities, an advisory letter issued by the Commission staff under this Act after the date of enactment of this section, or an order issued by the Commission under this Act after the date of enactment of this section, shall not be required for the purpose, or have the effect, of exempting such person from treatment as an electric utility company under section 2(a)(3) or exempting such person from any provision of this Act.

"(j) OWNERSHIP OF EXEMPT WHOLESALE GENERATORS AND QUALIFYING FACILITIES.--The ownership by a person of one or more exempt wholesale generators shall not result in such person being considered as being primarily engaged in the generation or sale of electric power within the meaning of sections 3(17)(C)(ii) and 3(18)(B)(ii) of the Federal Power Act (16 U.S.C. 796(17)(C)(ii) and 796(18)(B)(ii)).

"(k) PROTECTION AGAINST ABUSIVE AFFILIATE TRANSACTIONS.--

"(1) PROHIBITION.--After the date of enactment of this section, an electric utility company may not enter into a contract to purchase electric energy at wholesale from an exempt wholesale generator if the exempt wholesale generator is an affiliate or associate company of the electric utility company

"(2) STATE AUTHORITY TO EXEMPT FROM PROHIBITION.--Notwithstanding paragraph (1), an electric utility company may enter into a contract to purchase electric energy at wholesale from an exempt wholesale generator that is an affiliate or associate company of the electric utility company--

"(A) if every State commission having jurisdiction over the retail rates of such electric utility company makes each of the following specific determinations in advance of the electric utility company entering into such contract:

"(i) A determination that such commission has sufficient regulatory authority, resources and access to books and records of the electric utility company and any relevant associate, affiliate or subsidiary company to exercise its duties under this subparagraph.

"(ii) A determination that the transaction--

"(I) will benefit consumers,

"(II) does not violate any State law (including where applicable, least cost planning),

"(III) would not provide the exempt wholesale generator any unfair competitive advantage by virtue of its affiliation or association with the electric utility company, and

"(IV) is in the public interest; or

"(B) if such electric utility company is not subject to State commission retail rate regulation and the purchased electric energy:

"(i) would not be resold to any affiliate or associate company, or

"(ii) the purchased electric energy would be resold to an affiliate or associate company and every State commission having jurisdiction over the retail rates of such affiliate or associate company makes each of the determinations provided under subparagraph (A), including the determination concerning a State commission's duties.

"(l) RECIPROCAL ARRANGEMENTS PROHIBITED.--Reciprocal arrangements among companies that are not affiliates or associate companies of each other that are entered into in order to avoid the provisions of this section are prohibited.".



SEC. 712. STATE CONSIDERATION OF THE EFFECTS OF POWER PURCHASES ON UTILITY COST OF CAPITAL; CONSIDERATION OF THE EFFECTS OF LEVERAGED CAPITAL STRUCTURES ON THE RELIABILITY OF WHOLESALE POWER SELLERS; AND CONSIDERATION OF ADEQUATE FUEL SUPPLIES.



Section 111 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 and following) is amended by inserting the following new paragraph after paragraph (9):

"(10) CONSIDERATION OF THE EFFECTS OF WHOLESALE POWER PURCHASES ON UTILITY COST OF CAPITAL; EFFECTS OF LEVERAGED CAPITAL STRUCTURES ON THE RELIABILITY OF WHOLESALE POWER SELLERS; AND ASSURANCE OF ADEQUATE FUEL SUPPLIES.--(A) To the extent that a State regulatory authority requires or allows electric utilities for which it has ratemaking authority to consider the purchase of long-term wholesale power supplies as a means of meeting electric demand, such authority shall perform a general evaluation of:

"(i) the potential for increases or decreases in the costs of capital for such utilities, and any resulting increases or decreases in the retail rates paid by electric consumers, that may result from purchases of long-term wholesale power supplies in lieu of the construction of new generation facilities by such utilities;

"(ii) whether the use by exempt wholesale generators (as defined in section 32 of the Public Utility Holding Company Act of 1935) of capital structures which employ proportionally greater amounts of debt than the capital structures of such utilities threatens reliability or provides an unfair advantage for exempt wholesale generators over such utilities;

"(iii) whether to implement procedures for the advance approval or disapproval of the purchase of a particular long-term wholesale power supply; and

"(iv) whether to require as a condition for the approval of the purchase of power that there be reasonable assurances of fuel supply adequacy.

"(B) For purposes of implementing the provisions of this paragraph, any reference contained in this section to the date of enactment of the Public Utility Regulatory Policies Act of 1978 shall be deemed to be a reference to the date of enactment of this paragraph.

"(C) Notwithstanding any other provision of Federal law, nothing in this paragraph shall prevent a State regulatory authority from taking such action, including action with respect to the allowable capital structure of exempt wholesale generators, as such State regulatory authority may determine to be in the public interest as a result of performing evaluations under the standards of subparagraph (A).

"(D) Notwithstanding section 124 and paragraphs (1) and (2) of section 112(a), each State regulatory authority shall consider and make a determination concerning the standards of subparagraph (A) in accordance with the requirements of subsections (a) and (b) of this section, without regard to any proceedings commenced prior to the enactment of this paragraph.

"(E) Notwithstanding subsections (b) and (c) of section 112, each State regulatory authority shall consider and make a determination concerning whether it is appropriate to implement the standards set out in subparagraph (A) not later than one year after the date of enactment of this paragraph.".



SEC. 713. PUBLIC UTILITY HOLDING COMPANIES TO OWN INTERESTS IN COGENERATION FACILITIES.



Public Law 99-186 (99 Stat. 1180, as amended by Public Law 99-553, 100 Stat. 3087), is amended to read as follows:

"SECTION 1. Notwithstanding section 11(b)(1) of the Public Utility Holding Company Act of 1935, a company registered under said Act, or a subsidiary company of such registered company, may acquire or retain, in any geographic area, an interest in any qualifying cogeneration facilities and qualifying small power production facilities as defined pursuant to the Public Utility Regulatory Policies Act of 1978, and shall qualify for any exemption relating to the Public Utility Holding Company Act of 1935 prescribed pursuant to section 210 of the Public Utility Regulatory Policies Act of 1978.

"SEC. 2. Nothing herein shall be construed to affect the applicability of section 3(17)(C) or section 3(18)(B) of the Federal Power Act or any provision of the Public Utility Holding Company Act of 1935, other than section 11(b)(1), to the acquisition or retention of any such interest by any such company.".



SEC. 714. BOOKS AND RECORDS.



Section 201 of the Federal Power Act is amended by adding the following new subsection at the end thereof:

"(g) BOOKS AND RECORDS.--(1) Upon written order of a State commission, a State commission may examine the books, accounts, memoranda, contracts, and records of--

"(A) an electric utility company subject to its regulatory authority under State law,

"(B) any exempt wholesale generator selling energy at wholesale to such electric utility, and

"(C) any electric utility company, or holding company thereof, which is an associate company or affiliate of an exempt wholesale generator which sells electric energy to an electric utility company referred to in subparagraph (A), wherever located, if such examination is required for the effective discharge of the State commission's regulatory responsibilities affecting the provision of electric service.

"(2) Where a State commission issues an order pursuant to paragraph (1), the State commission shall not publicly disclose trade secrets or sensitive commercial information.

"(3) Any United States district court located in the State in which the State commission referred to in paragraph (1) is located shall have jurisdiction to enforce compliance with this subsection.

"(4) Nothing in this section shall--

"(A) preempt applicable State law concerning the provision of records and other information; or

"(B) in any way limit rights to obtain records and other information under Federal law, contracts, or otherwise.

"(5) As used in this subsection the terms 'affiliate,' 'associate company', 'electric utility company', 'holding company', 'subsidiary company', and 'exempt wholesale generator' shall have the same meaning as when used in the Public Utility Holding Company Act of 1935.".



SEC. 715. INVESTMENT IN FOREIGN UTILITIES.



The Public Utility Holding Company Act of 1935 (15 U.S.C. 79 et seq.) is amended by inserting after section 32 the following new section:



"SEC. 33. TREATMENT OF FOREIGN UTILITIES.



"(a) EXEMPTIONS FOR FOREIGN UTILITY COMPANIES.--

"(1) IN GENERAL.--A foreign utility company shall be exempt from all of the provisions of this Act, except as otherwise provided under this section, and shall not, for any purpose under this Act, be deemed to be a public utility company under section 2(a)(5), notwithstanding that the foreign utility company may be a subsidiary company, an affiliate, or an associate company of a holding company or of a public utility company.

"(2) STATE COMMISSION CERTIFICATION.--Section (a)(1) shall not apply or be effective unless every State commission having jurisdiction over the retail electric or gas rates of a public utility company that is an associate company or an affiliate of a company otherwise exempted under section (a)(1) (other than a public utility company that is an associate company or an affiliate of a registered holding company) has certified to the Commission that it has the authority and resources to protect ratepayers subject to its jurisdiction and that it intends to exercise its authority. Such certification, upon the filing of a notice by such State commission, may be revised or withdrawn by the State commission prospectively as to any future acquisition. The requirement of State certification shall be deemed satisfied if the relevant State commission had, prior to the date of enactment of this section, on the basis of prescribed conditions of general applicability, determined that ratepayers of a public utility company are adequately insulated from the effects of diversification and the diversification would not impair the ability of the State commission to regulate effectively the operations of such company.

"(3) DEFINITION.--For purposes of this section, the term 'foreign utility company' means any company that--

"(A) owns or operates facilities that are not located in any State and that are used for the generation, transmission, or distribution of electric energy for sale or the distribution at retail of natural or manufactured gas for heat, light, or power, if such company--

"(i) derives no part of its income, directly or indirectly, from the generation, transmission, or distribution of electric energy for sale or the distribution at retail of natural or manufactured gas for heat, light, or power, within the United States; and

"(ii) neither the company nor any of its subsidiary companies is a public utility company operating in the United States; and

"(B) provides notice to the Commission, in such form as the Commission may prescribe, that such company is a foreign utility company.

"(b) OWNERSHIP OF FOREIGN UTILITY COMPANIES BY EXEMPT HOLDING COMPANIES.--Notwithstanding any provision of this Act except as provided under this section, a holding company that is exempt under section 3 of the Act shall be permitted without condition or limitation under the Act to acquire and maintain an interest in the business of one or more foreign utility companies.

"(c) REGISTERED HOLDING COMPANIES.--

"(1) OWNERSHIP OF FOREIGN UTILITY COMPANIES BY REGISTERED HOLDING COMPANIES.--Notwithstanding any provision of this Act except as otherwise provided under this section, a registered holding company shall be permitted as of the date of enactment of this section (without the need to apply for or receive approval from the Commission) to acquire and hold the securities or an interest in the business, of one or more foreign utility companies. The Commission shall promulgate rules or regulations regarding registered holding companies' acquisition of interests in foreign utility companies which shall provide for the protection of the customers of a public utility company which is an associate company of a foreign utility company and the maintenance of the financial integrity of the registered holding company system.

"(2) ISSUANCE OF SECURITIES.--The issuance of securities by a registered holding company for purposes of financing the acquisition of a foreign utility company, the guarantee of securities of a foreign utility company by a registered holding company, the entering into service, sales, or construction contracts, and the creation or maintenance of any other relationship between a foreign utility company and a registered holding company, its affiliates and associate companies, shall remain subject to the jurisdiction of the Commission under this Act (unless otherwise exempted under this Act, in the case of a transaction with an affiliate or associate company located outside of the United States). Any State commission with jurisdiction over the retail rates of a public utility company which is part of a registered holding company system may make such recommendations to the Commission regarding the registered holding company's relationship to a foreign utility company, and the Commission shall reasonably and fully consider such State recommendation.

"(3) CONSTRUCTION.--Any interest in the business of 1 or more foreign utility companies, or 1 or more companies organized exclusively to own, directly or indirectly, the securities or other interest in a foreign utility company, shall for all purposes of this Act, be considered to be--

"(A) consistent with the operation of a single integrated public utility system, within the meaning of section 11; and

"(B) reasonably incidental, or economically necessary or appropriate, to the operations of an integrated public utility system, within the meaning of section 11.

"(d) EFFECT ON EXISTING LAW; NO STATE PREEMPTION.--Nothing in this section shall--

"(1) preclude any person from qualifying for or maintaining any exemption otherwise provided for under this Act or the rules, regulations, or orders promulgated or issued under this Act; or

"(2) be deemed or construed to limit the authority of any State (including any State regulatory authority) with respect to--

"(A) any public utility company or holding company subject to such State's jurisdiction; or

"(B) any transaction between any foreign utility company (or any affiliate or associate company thereof) and any public utility company or holding company subject to such State's jurisdiction.

"(e) REPORTING REQUIREMENTS.--

"(1) FILING OF REPORTS.--A public utility company that is an associate company of a foreign utility company shall file with the Commission such reports (with respect to such foreign utility company) as the Commission may by rules, regulations, or order prescribe as necessary or appropriate in the public interest or for the protection of investors or consumers.

"(2) NOTICE OF ACQUISITIONS.--Not later than 30 days after the consummation of the acquisition of an interest in a foreign utility company by an associate company of a public utility company that is subject to the jurisdiction of a State commission with respect to its retail electric or gas rates or by such public utility company, such associate company or such public utility company, shall provide notice of such acquisition to every State commission having jurisdiction over the retail electric or gas rates of such public utility company, in such form as may be prescribed by the State commission.

"(f) PROHIBITION ON ASSUMPTION OF LIABILITIES.--

"(1) IN GENERAL.--No public utility company that is subject to the jurisdiction of a State commission with respect to its retail electric or gas rates shall issue any security for the purpose of financing the acquisition, or for the purposes of financing the ownership or operation, of a foreign utility company, nor shall any such public utility company assume any obligation or liability as guarantor, endorser, surety, or otherwise in respect of any security of a foreign utility company.

"(2) EXCEPTION FOR HOLDING COMPANIES WHICH ARE PREDOMINANTLY PUBLIC UTILITY COMPANIES.--Subsection (f)(1) shall not apply if:

"(A) the public utility company that is subject to the jurisdiction of a State commission with respect to its retail electric or gas rates is a holding company and is not an affiliate under section 2(a)(11)(B) of another holding company or is not subject to regulation as a holding company and has no affiliate as defined in section 2(a)(11)(A) that is a public utility company subject to the jurisdiction of a State commission with respect to its retail electric or gas rates; and

"(B) each State commission having jurisdiction with respect to the retail electric and gas rates of such public utility company expressly permits such public utility to engage in a transaction otherwise prohibited under section (f)(1); and

"(C) the transaction (aggregated with all other then outstanding transactions exempted under this subsection) does not exceed 5 per centum of the then- outstanding total capitalization of the public utility.

"(g) PROHIBITION ON PLEDGING OR ENCUMBERING UTILITY ASSETS.--No public utility company that is subject to the jurisdiction of a State commission with respect to its retail electric or gas rates shall pledge or encumber any utility assets or utility assets of any subsidiary thereof for the benefit of an associate foreign utility company.".



Subtitle B -- Federal Power Act;
Interstate Commerce in Electricity



SEC. 721. AMENDMENTS TO SECTION 211 OF FEDERAL POWER ACT.



Section 211 of the Federal Power Act (16 U.S.C. 824j) is amended as follows:

(1) The first sentence of subsection (a) is amended to read as follows: "Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant.".

(2) In the second sentence of subsection (a), strike "the Commission may" and all that follows and insert "the Commission may issue such order if it finds that such order meets the requirements of section 212, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.".

(3) Amend subsection (b) to read as follows:

"(b) RELIABILITY OF ELECTRIC SERVICE.--No order may be issued under this section or section 210 if, after giving consideration to consistently applied regional or national reliability standards, guidelines, or criteria, the Commission finds that such order would unreasonably impair the continued reliability of electric systems affected by the order.".

(4) In subsection (c)--

(A) Strike out paragraph (1).

(B) In paragraph (2) strike "which requires the electric" and insert "which requires the transmitting".

(C) Strike out paragraphs (3) and (4).

(5) In subsection (d)--

(A) In the first sentence of paragraph (1), strike "electric" and insert "transmitting" in each place it appears.

(B) In the second sentence of paragraph (1) before "and each affected electric utility," insert "each affected transmitting utility,".

(C) In paragraph (3), strike "electric" and insert "transmitting".

(D) Strike the period in subparagraph (B) of paragraph (1) and insert ", or" and after subparagraph (B) insert the following new subparagraph:

"(C) the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has failed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.".



SEC. 722. TRANSMISSION SERVICES.



Section 212 of the Federal Power Act is amended as follows:

(1) Strike subsections (a) and (b) and insert the following:

"(a) RATES, CHARGES, TERMS, AND CONDITIONS FOR WHOLESALE TRANSMISSION SERVICES.--An order under section 211 shall require the transmitting utility subject to the order to provide wholesale transmission services at rates, charges, terms, and conditions which permit the recovery by such utility of all the costs incurred in connection with the transmission services and necessary associated services, including, but not limited to, an appropriate share, if any, of legitimate, verifiable and economic costs, including taking into account any benefits to the transmission system of providing the transmission service, and the costs of any enlargement of transmission facilities. Such rates, charges, terms, and conditions shall promote the economically efficient transmission and generation of electricity and shall be just and reasonable, and not unduly discriminatory or preferential. Rates, charges, terms, and conditions for transmission services provided pursuant to an order under section 211 shall ensure that to the extent practicable, costs incurred in providing the wholesale transmission services, and properly allocable to the provision of such services, are recovered from the applicant for such order and not from a transmitting utility's existing wholesale, retail, and transmission customers.".

(2) Subsection (e) is amended to read as follows:

"(e) SAVINGS PROVISIONS.--(1) No provision of section 210, 211, 214, or this section shall be treated as requiring any person to utilize the authority of any such section in lieu of any other authority of law. Except as provided in section 210, 211, 214, or this section, such sections shall not be construed as limiting or impairing any authority of the Commission under any other provision of law.

"(2) Sections 210, 211, 213, 214, and this section, shall not be construed to modify, impair, or supersede the antitrust laws. For purposes of this section, the term 'antitrust laws' has the meaning given in subsection (a) of the first sentence of the Clayton Act, except that such term includes section 5 of the Federal Trade Commission Act to the extent that such section relates to unfair methods of competition.".

(3) Add the following new subsections at the end thereof:

"(g) PROHIBITION ON ORDERS INCONSISTENT WITH RETAIL MARKETING AREAS.--No order may be issued under this Act which is inconsistent with any State law which governs the retail marketing areas of electric utilities.

"(h) PROHIBITION ON MANDATORY RETAIL WHEELING AND SHAM WHOLESALE TRANSACTIONS.--No order issued under this Act shall be conditioned upon or require the transmission of electric energy:

"(1) directly to an ultimate consumer, or

"(2) to, or for the benefit of, an entity if such electric energy would be sold by such entity directly to an ultimate consumer, unless:

"(A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned directly or indirectly, by any one or more of the foregoing; and

"(B) such entity was providing electric service to such ultimate consumer on the date of enactment of this subsection or would utilize transmission or distribution facilities that it owns or controls to deliver all such electric energy to such electric consumer.

Nothing in this subsection shall affect any authority of any State or local government under State law concerning the transmission of electric energy directly to an ultimate consumer.".

"(i) LAWS APPLICABLE TO FEDERAL COLUMBIA RIVER TRANSMISSION SYSTEM.--(1) The Commission shall have authority pursuant to section 210, section 211, this section, and section 213 to (A) order the Administrator of the Bonneville Power Administration to provide transmission service and (B) establish the terms and conditions of such service. In applying such sections to the Federal Columbia River Transmission System, the Commission shall assure that--

"(i) the provisions of otherwise applicable Federal laws shall continue in full force and effect and shall continue to be applicable to the system; and

"(ii) the rates for the transmission of electric power on the system shall be governed only by such otherwise applicable provisions of law and not by any provision of section 210, section 211, this section, or section 213, except that no rate for the transmission of power on the system shall be unjust unreasonable, or unduly discriminatory or preferential, as determined by the Commission.

"(2) Notwithstanding any other provision of this Act with respect to the procedures for the determination of terms and conditions for transmission service--

"(A) when the Administrator of the Bonneville Power Administration either (I) in response to a written request for specific transmission service terms and conditions does not offer the requested terms and conditions, or (ii) proposes to establish terms and conditions of general applicability for transmission service on the Federal Columbia River Transmission System, then the Administrator may provide opportunity for a hearing and, in so doing, shall--

"(I) give notice in the Federal Register and state in such notice the written explanation of the reasons why the specific terms and conditions for transmission services are not being offered or are being proposed;

"(II) adhere to the procedural requirements of Paragraphs (1) through (3) of section 7(I) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839(I) (1) through (3)), except that the hearing officer shall, unless the hearing officer becomes unavailable to the agency, make a recommended decision to the Administrator that states the hearing officer's findings and conclusions, and the reasons or basis thereof, on all material issues of fact, law, or discretion presented on the record; and

"(III) make a determination, setting forth the reasons for reaching any findings and conclusions which may differ from those of the hearing officer, based on the hearing record, consideration of the hearing officer's recommended decision, section 211 and this section, as amended by the Energy Policy Act of 1992, and the provisions of law as preserved in this section; and

"(B) if application is made to the Commission under section 211 for transmission service under terms and conditions different than those offered by the Administrator, or following the denial of a request for transmission service by the Administrator, and such application is filed within 60 days of the Administrator's final determination and in accordance with Commission procedures, the Commission shall--

"(i) in the event the Administrator has conducted a hearing as herein provided for (I) accord parties to the Administrator's hearing the opportunity to offer for the Commission record materials excluded by the Administrator from the hearing record, (II) accord such parties the opportunity to submit for the Commission record comments on appropriate terms and conditions, (III) afford those parties the opportunity for a hearing if and to the extent that the Commission finds the Administrator's hearing record to be inadequate to support a decision by the Commission, and (IV) establish terms and conditions for or deny transmission service based on the Administrator's hearing record, the Commission record, section 211 and this section, as amended by the Energy Policy Act of 1992, and the provisions of law as preserved in this section, or

"(ii) in the event the Administrator has not conducted a hearing as herein provided for, determine whether to issue an order for transmission service in accordance with section 211 and this section, including providing the opportunity for a hearing.

"(3) Notwithstanding those provisions of section 313(b) of this Act (16 U.S.C. 825l) which designate the court in which review may be obtained, any party to a proceeding concerning transmission service sought to be furnished by the Administrator of the Bonneville Power Administration seeking review of an order issued by the Commission in such proceeding shall obtain a review of such order in the United States Court of Appeals for the Pacific Northwest, as that region is defined by section 3(14) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839a( 14)).

"(4) To the extent the Administrator of the Bonneville Power Administration cannot be required under section 211, as a result of the Administrator's other statutory mandates, either to (A) provide transmission service to an applicant which the Commission would otherwise order, or (B) provide such service under rates, terms, and conditions which the Commission would otherwise require, the applicant shall not be required to provide similar transmission services to the Administrator or to provide such services under similar rates, terms and conditions.

"(5) The Commission shall not issue any order under section 210, section 211, this section, or section 213 requiring the Administrator of the Bonneville Power Administration to provide transmission service if such an order would impair the Administrator's ability to provide such transmission service to the Administrator's power and transmission customers in the Pacific Northwest, as that region is defined in section 3(14) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839a(14)), as is needed to assure adequate and reliable service to loads in that region.

"(j) EQUITABILITY WITHIN TERRITORY RESTRICTED ELECTRIC SYSTEMS.--With respect to an electric utility which is prohibited by Federal law from being a source of power supply, either directly or through a distributor of its electric energy, outside an area set forth in such law, no order issued under section 211 may require such electric utility (or a distributor of such electric utility) to provide transmission services to another entity if the electric energy to be transmitted will be consumed within the area set forth in such Federal law, unless the order is in furtherance of a sale of electric energy to that electric utility: Provided, however, That the foregoing provision shall not apply to any area served at retail by an electric transmission system which was such a distributor on the date of enactment of this subsection and which before October 1, 1991, gave its notice of termination under its power supply contract with such electric utility.

"(k) ERCOT UTILITIES.--

"(1) RATES.--Any order under section 211 requiring provision of transmission services in whole or in part within ERCOT shall provide that any ERCOT utility which is not a public utility and the transmission facilities of which are actually used for such transmission service is entitled to receive compensation based, insofar as practicable and consistent with subsection (a), on the transmission ratemaking methodology used by the Public Utility Commission of Texas.

"(2) DEFINITIONS.--For purposes of this subsection--

"(A) the term 'ERCOT' means the Electric Reliability Council of Texas; and

"(B) the term 'ERCOT utility' means a transmitting utility which is a member of ERCOT.".



SEC. 723. INFORMATION REQUIREMENTS.

Part II of the Federal Power Act is amended by adding the following new section after section 212:



"SEC. 213. INFORMATION REQUIREMENTS.



"(a) REQUESTS FOR WHOLESALE TRANSMISSION SERVICES.-- Whenever any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale makes a good faith request to a transmitting utility to provide wholesale transmission services and requests specific rates and charges, and other terms and conditions, unless the transmitting utility agrees to provide such services at rates, charges, terms and conditions acceptable to such person, the transmitting utility shall, within 60 days of its receipt of the request, or other mutually agreed upon period, provide such person with a detailed written explanation, with specific reference to the facts and circumstances of the request, stating (1) the transmitting utility's basis for the proposed rates, charges, terms and conditions for such services and (2) its analysis of any physical or other constraints affecting the provision of such services.

"(b) TRANSMISSION CAPACITY AND CONSTRUCTS.--Not later than 1 year after the enactment of this section, the Commission shall promulgate a rule requiring that information be submitted annually to the Commission by transmitting utilities which is adequate to inform potential transmission customers, State regulatory authorities, and the public of potentially available transmission capacity and known constraints.".



SEC. 724. SALES BY EXEMPT WHOLESALE GENERATORS.

Part II of the Federal Power Act is amended by adding the following new section after section 213:



"SEC. 214. SALES BY EXEMPT WHOLESALE GENERATORS.



"No rate or charge received by an exempt wholesale generator for the sale of electric energy shall be lawful under section 205 if, after notice and opportunity for hearing, the Commission finds that such rate or charge results from the receipt of any undue preference or advantage from an electric utility which is an associate company or an affiliate of the exempt wholesale generator. For purposes of this section, the terms 'associate company' and 'affiliate' shall have the same meaning as provided in section 2(a) of the Public Utility Holding Company Act of 1935.".



SEC. 725. PENALTIES.



(a) EXISTING PENALTIES NOT APPLICABLE TO TRANSMISSION PROVISIONS.--Sections 315 and 316 of the Federal Power Act are each amended by adding the following at the end thereof:

"(c) This subsection shall not apply in the case of any provision of section 211, 212, 213, or 214 or any rule or order issued under any such provision.".

(b) PENALTIES APPLICABLE TO TRANSMISSION PROVISIONS.--Title III of the Federal Power Act is amended by inserting the following new section after section 316:



"SEC. 316A. ENFORCEMENT OF CERTAIN PROVISIONS.



"(a) VIOLATIONS.--It shall be unlawful for any person to violate any provision of section 211, 212, 213, or 214 or any rule or order issued under any such provision.

"(b) CIVIL PENALTIES.--Any person who violates any provision of section 211, 212, 213, or 214 or any provision of any rule or order thereunder shall be subject to a civil penalty of not more than $10,000 for each day that such violation continues. Such penalty shall be assessed by the Commission, after notice and opportunity for public hearing, in accordance with the same provisions as are applicable under section 31(d) in the case of civil penalties assessed under section 31. In determining the amount of a proposed penalty, the Commission shall take into consideration the seriousness of the violation and the efforts of such person to remedy the violation in a timely manner.".



SEC. 726. DEFINITIONS.



(a) ADDITIONAL DEFINITIONS.--Section 3 of the Federal Power Act is amended by adding the following at the end thereof:

"(23) TRANSMITTING UTILITY.--The term 'transmitting utility' means any electric utility, qualifying cogeneration facility, qualifying small power production facility, or Federal power marketing agency which owns or operates electric power transmission facilities which are used for the sale of electric energy at wholesale.

"(24) WHOLESALE TRANSMISSION SERVICES.--The term 'wholesale transmission services' means the transmission of electric energy sold, or to be sold, at wholesale in interstate commerce.

"(25) EXEMPT WHOLESALE GENERATOR.--The term 'exempt wholesale generator' shall have the meaning provided by section 32 of the Public Utility Holding Company Act of 1935.".

(b) CLARIFICATION OF TERMS.--Section 3(22) of the Federal Power Act is amended by inserting "(including any municipality)" after "State agency".





Subtitle C--State and Local Authorities



SEC. 731. STATE AUTHORITIES.



Nothing in this title or in any amendment made by this title shall be construed as affecting or intending to affect, or in any way to interfere with, the authority of any State or local government relating to environmental protection or the siting of facilities.





Selected Provisions of the Federal Power Act



RATE AND CHARGES; SCHEDULES; SUSPENSION OF NEW RATES


SEC. 205. (a) All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.

(b) No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.

(c) Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classification, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.

(d) Unless the Commission otherwise orders, no change shall be made by any public utility in any such rates, charges, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days' notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. The Commission, for good cause shown, may allow changes to take effect without requiring the sixty days' notice herein provided for by an order specifying the changes so to be made and the time when they shall take effect and the manner in which they shall be filed and published.

(e) Whenever any such new schedule is filed the Commission shall have authority, either upon complaint or upon its own initiative without complaint at once, and, if it so orders, without answer or formal pleading by the public utility, but upon reasonable notice to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon the Commission, upon filing with such schedules and delivering to the public utility affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of such five months, the proposed change of rate, charge, classification, or service shall go into effect at the end of such period, but in case of a proposed increased rate or charge, the Commission may by order require the interested public utility or public utilities to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts are paid, and upon completion of the hearing and decision may by further order require such public utility or public utilities to refund with interest, to the persons in whose behalf such amounts were paid, such portion of such increased rates or charges as by its decision shall be found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.

(f)(1) Not later than 2 years after the date of the enactment of this subsection and not less often than every 4 years thereafter, the Commission shall make a thorough review of automatic adjustment clauses in public utility rate schedules to examine--

(A) whether or not each such clause effectively provides incentives for efficient use of resources (including economical purchase and use of fuel and electric energy), and

(B) whether any such clause reflects any costs other than costs which are--

(i) subject to periodic fluctuations, and

(ii) not susceptible to precise determinations in rate cases prior to the time such costs are incurred.

Such review may take place in individual rate proceedings or in generic or other separate proceedings applicable to one or more utilities.

(2) Not less frequently than every 2 years, in rate proceedings or in generic or other separate proceedings, the Commission shall review, with respect to each public utility, practices under any automatic adjustment clauses of such utility to insure efficient use of resources (including economical purchase and use of fuel and electric energy) under such clauses.

(3) The Commission may, on its own motion or upon complaint, after an opportunity for an evidentiary hearing, order a public utility to--

(A) modify the terms and provisions of any automatic adjustment clause, or

(B) cease any practice in connection with the clause, if such clause or practice does not result in the economical purchase and use of fuel, electric energy, or other items, the cost of which is included in any rate schedule under an automatic adjustment clause.

(4) As used in this subsection, the term "automatic adjustment clause" means a provision of a rate schedule which provides for increases or decreases (or both), without prior hearing, in rates reflecting increases or decreases (or both) in costs incurred by an electric utility. Such term does not include any rate which takes effect subject to refund and subject to a later determination of the appropriate amount of such rate.

(16 U.S.C. 824d)



FIXING RATES AND CHARGES; DETERMINATION OF COST OF PRODUCTION OR TRANSPORTATION


SEC. 206. (a) Whenever the Commission, after a hearing had upon its own motion or upon complaint, shall find that any rate, charges, or classification demanded, observed, charged, or collected by any public utility for any transmission or sale subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order.

(b) Whenever the Commission institutes a proceeding under this section, the Commission shall establish a refund effective date. In the case of a proceeding instituted on complaint, the refund effective date shall not be earlier than the date 60 days after the filing of such complaint nor later than 5 months after the expiration of such 60-day period. In the case of a proceeding instituted by the Commission on its own motion, the refund effective date shall not be earlier than the date 60 days after the publication by the Commission of notice of its intention to initiate such proceeding nor later than 5 months after the expiration of such 60-day period. Upon institution of a proceeding under this section, the Commission shall give to the decision of such proceeding the same preference as provided under section 205 of this Act and otherwise act as speedily as possible. If no final decision is rendered by the refund effective date or by the conclusion of the 180-day period commencing upon initiation of a proceeding pursuant to this section, whichever is earlier, the Commission shall state the reasons why it has failed to do so and shall state its best estimate as to when it reasonably expects to make such decision. In any proceeding under this section, the burden of proof to show that any rate, charge, classification, rule, regulation, practice, or contract is unjust, unreasonable, unduly discriminatory, or preferential shall be upon the Commission or the complainant. At the conclusion of any proceeding under this section, the Commission may order the public utility to make refunds of any amounts paid, for the period subsequent to the refund effective date through a date fifteen months after such refund effective date, in excess of those which would have been paid under the just and reasonable rate, charge, classification, rule, regulation, practice, or contract which the Commission orders to be thereafter observed and in force: Provided, That if the proceeding is not concluded within fifteen months after the refund effective date and if the Commission determines at the conclusion of the proceeding that the proceeding was not resolved within the fifteen-month period primarily because of dilatory behavior by the public utility, the Commission may order refunds of any or all amounts paid for the period subsequent to the refund effective date and prior to the conclusion of the proceeding. The refunds shall be made, with interest, to those persons who have paid those rates or charges which are the subject of the proceeding.

(c) Notwithstanding subsection (b), in a proceeding commenced under this section involving two or more electric utility companies of a registered holding company, refunds which might otherwise be payable under subsection (b) shall not be ordered to the extent that such refunds would result from any portion of a Commission order that (1) requires a decrease in system production or transmission costs to be paid by one or more of such electric companies; and (2) is based upon a determination that the amount of such decrease should be paid through an increase in the costs to be paid by other electric utility companies of such registered holding company: Provided, That refunds, in whole or in part, may be ordered by the Commission if it determines that the registered holding company would not experience any reduction in revenues which results from an inability of an electric utility company of the holding company to recover such increase in costs for the period between the refund effective date and the effective date of the Commission's order. For purposes of this subsection, the terms "electric utility companies" and "registered holding company" shall have the same meanings as provided in the Public Utility Holding Company Act of 1935, as amended.

(d) The Commission upon its own motion, or upon the request of any State commission whenever it can do so without prejudice to the efficient and proper conduct of its affairs, may investigate and determine the cost of the production or transmission of electric energy by means of facilities under the jurisdiction of the Commission in cases where the Commission has no authority to establish a rate governing the sale of such energy.

(16 U.S.C. 824i)



CERTAIN WHEELING AUTHORITY


SEC. 211. (a) Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant. Upon receipt of such application, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such order if it finds that such order meets the requirements of section 212, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.

(b) RELIABILITY OF ELECTRIC SERVICE.--No order may be issued under this section or section 210 if, after giving consideration to consistently applied regional or national reliability standards, guidelines, or criteria, the Commission finds that such order would unreasonably impair the continued reliability of electric systems affected by the order.

(c)(2)(232) No order may be issued under subsection (a) or (b) which requires the transmitting utility subject to the order to transmit, during any period, an amount of electric energy which replaces any amount of electric energy--

(A) required to be provided to such applicant pursuant to a contract during such period, or

(B) currently provided to the applicant by the utility subject to the order pursuant to a rate schedule on file during such period with the Commission: Provided, That nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination of modification of an existing rate schedule: Provided, That such order shall not become effective until termination of such rate schedule or the modification becomes effective.

(d)(1) Any transmitting utility ordered under subsection (a) or (b) to provide transmission services may apply to the Commission for an order permitting such transmitting utility to cease providing all, or any portion of, such services. After public notice, notice to each affected State regulatory authority, each affected Federal power marketing agency, each affected transmitting utility, and each affected electric utility, and after an opportunity for an evidentiary hearing, the Commission shall issue an order terminating or modifying the order issued under subsection (a) or (b), if the electric utility providing such transmission services has demonstrated, and the Commission has found, that--

(A) due to changed circumstances, the requirements applicable, under this section and section 212, to the issuance of an order under subsection (a) or (b) are no longer met, or

(B) any transmission capacity of the utility providing transmission services under such order which was, at the time such order was issued, in excess of the capacity necessary to serve its own customers is no longer in excess of the capacity necessary for such purposes, or

(c) the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has failed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.

No order shall be issued under this subsection pursuant to a finding under subparagraph (A) unless the Commission finds that such order is in the public interest.

(2) Any order issued under this subsection terminating or modifying an order issued under subsection (a) or (b) shall--

(A) provide for any appropriate compensation, and

(B) provide the affected electric utilities adequate opportunity and time to--

(i) make suitable alternative arrangements for any transmission services terminated or modified, and

(ii) insure that the interests of ratepayers of such utilities are adequately protected.

(3) No order may be issued under this subsection terminating or modifying any order issued under subsection (a) or (b) if the order under subsection (a) or (b) includes terms and conditions agreed among by the parties which--

(A) fix a period during which transmission services are to be provided under the order under subsection (a) or (b), or

(B) otherwise provide procedures or methods for terminating or modifying such order (including, if appropriate, the return of the transmission capacity when necessary to take into account an increase, after the issuance of such order, in the needs of the transmitting utility subject to such order for transmission capacity).

(e) As used in this section, the term " facilities" means only facilities used for the generation or transmission of electric energy.

(16 U.S.C. 824j)



PROVISIONS REGARDING CERTAIN ORDERS REQUIRING INTERCONNECTION OR WHEELING


SEC. 212. (a) RATES, CHARGES, TERMS, AND CONDITIONS FOR WHOLESALE TRANSMISSION SERVICES.--An order under section 211 shall require the transmitting utility subject to the order to provide wholesale transmission services at rates, charges, terms, and conditions which permit the recovery by such utility of all the costs incurred in connection with the transmission services and necessary associated services, including, but not limited to, an appropriate share, if any, of legitimate, verifiable and economic costs, including taking into account any benefits to the transmission system of providing the transmission service, and the costs of any enlargement of transmission facilities. Such rates, charges, terms, and conditions shall promote the economically efficient transmission and generation of electricity and shall be just and reasonable, and not unduly discriminatory or preferential. Rates, charges, terms, and conditions for transmission services provided pursuant to an order under section 211 shall ensure that, to the extent practicable, costs incurred in providing the wholesale transmission services, and properly allocable to the provision of such services, are recovered from the applicant for such order and not from a transmitting utility's existing wholesale, retail, and transmission customers.

[Subsection (b) repealed]

(c)(1) Before issuing an order under section 210 of subsection (a) or (b) of section 211, the Commission shall issue a proposed order and set a reasonable time for parties to the proposed interconnection or transmission order to agree to terms and conditions under which such order is to be carried out, including the apportionment of costs between them and the compensation or reimbursement reasonably due to any of them. Such proposed order shall not be reviewable or enforceable in any court. The time set for such parties to agree to such terms and conditions may be shortened if the Commission determines that delay would jeopardize the attainment of the purposes of any proposed order. Any terms and conditions agreed to by the parties shall be subject to the approval of the Commission.

(2)(A) If the parties agree as provided in paragraph (1) within the time set by the Commission and the Commission approves such agreement, the terms and conditions shall be included in the final order. In the case of an order under section 210, if the parties fail to agree within the time set by the Commission or if the Commission does not approve any such agreement, the Commission shall prescribe such terms and conditions and include such terms and conditions in the final order.

(B) In the case of any order applied for under section 211, if the parties fail to agree within the time set by the Commission, the Commission shall prescribe such terms and conditions in the final order.

(d) If the Commission does not issue any order applied for under section 210 or 211, the Commission shall, by order, deny such application and state the reasons for such denial.

(e) SAVINGS PROVISIONS.--(1) No provision of section 210, 211, 214, or this section shall be treated as requiring any person to utilize the authority of any such section in lieu of any other authority of law. Except as provided in section 210, 211, 214, or this section, such sections shall not be construed as limiting or impairing any authority of the Commission under any other provision of law.

(2) Sections 210, 211, 213, 214, and this section, shall not be construed to modify, impair, or supersede the antitrust laws. For purposes of this section, the term "antitrust laws" has the meaning given in subsection (a) of the first sentence of the Clayton Act, except that such term includes section 5 of the Federal Trade Commission Act to the extent that such section relates to unfair methods of competition.

(f)(1) No order under section 210 or 211 requiring the Tennessee Valley Authority (hereinafter in this subsection referred to as the "TVA") to take any action shall take effect for 60 days following the date of issuance of the order. Within 60 days following the issuance by the Commission of any order under section 210 or of section 211 requiring the TVA to enter into any contract for the sale or delivery of power, the Commission may on its own motion initiate, or upon petition of any aggrieved person shall initiate, an evidentiary hearing to determine whether or not such sale or delivery would result in violation of the third sentence of section 15d(a) of the Tennessee Valley Authority Act of 1933 (16 U.S.C. 831n --4), hereinafter in this subsection referred to as the TVA Act.

(2) Upon initiation of any evidentiary hearing under paragraph (1), the Commission shall give notice thereof to any applicant who applied for and obtained the order from the Commission, to any electric utility or other entity subject to such order, and to the public, and shall promptly make the determination referred to in paragraph (1). Upon initiation of such hearing, the Commission shall stay the effectiveness of the order under section 210 or 211 until whichever of the following dates is applicable--

(A) the date on which there is a final determination (including any judicial review thereof under paragraph (3)) that no such violation would result from such order, or

(B) the date on which a specific authorization of the Congress (within the meaning of the third sentence of section 15d(a) of the TVA Act) takes effect.

(3) Any determination under paragraph (1) shall be reviewable only in the appropriate court of the United States upon petition filed by any aggrieved person or municipality within 60 days after such determination, and such court shall have jurisdiction to grant appropriate relief. Any applicant who applied for and obtained the order under section 210 or 211, and any electric utility or other entity subject to such order shall have the right to intervene in and such proceeding in such court. Except for review by such court (and any appeal or other review by an appellate court of the United States), no court shall have jurisdiction to consider any action brought by any person to enjoin the carrying out of any order of the Commission under section 210 or section 211 requiring the TVA to take any action on the grounds that such action requires a specific authorization of the Congress pursuant to the third sentence of section 15d(a) of the TVA Act.

(g) PROHIBITION ON ORDERS INCONSISTENT WITH RETAIL MARKETING AREAS.--No order may be issued under this Act which is inconsistent with any State law which governs the retail marketing areas of electric utilities.

(h) PROHIBITION ON MANDATORY RETAIL WHEELING AND SHAM WHOLESALE TRANSACTIONS.--No order issued under this Act shall be conditioned upon or require the transmission of electric energy:

(1) directly to an ultimate consumer, or

(2) to, or for the benefit of, an entity if such electric energy would be sold by such entity directly to an ultimate consumer, unless:

(A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned, directly or indirectly, by any one or more of the foregoing; and

(B) such entity was providing electric service to such ultimate consumer on the date of enactment of this subsection or would utilize transmission or distribution facilities that it owns or controls to deliver all such electric energy to such electric consumer.

Nothing in this subsection shall affect any authority of any State or local government under State law concerning the transmission of electric energy directly to an ultimate consumer.

(i) LAWS APPLICABLE TO FEDERAL COLUMBIA RIVER TRANSMISSION SYSTEM.--(1) The Commission shall have authority pursuant to section 210, section 211, this section, and section 213 to (A) order the Administrator of the Bonneville Power Administration to provide transmission service and (B) establish the terms and conditions of such service. In applying such sections to the Federal Columbia River Transmission System, the Commission shall assure that--

(i) the provisions of otherwise applicable Federal laws shall continue in full force and effect and shall continue to be applicable to the system; and

(ii) the rates for the transmission of electric power on the system shall be governed only by such otherwise applicable provisions of law and not by any provision of section 210, section 211, this section, or section 213, except that no rate for the transmission of power on the system shall be unjust, unreasonable, or unduly discriminatory or preferential, as determined by the Commission.

(2) Notwithstanding any other provision of this Act with respect to the procedures for the determination of terms and conditions for transmission service--

(A) when the Administrator of the Bonneville Power Administration either (I) in response to a written request for specific transmission service terms and conditions does not offer the requested terms and conditions, or (ii) proposes to establish terms and conditions of general applicability for transmission service on the Federal Columbia River Transmission System, then the Administrator may provide opportunity for a hearing and, in so doing, shall--

(I) give notice in the Federal Register and state in such notice the written explanation of the reasons why the specific terms and conditions for transmission services are not being offered or are being proposed;

(II) adhere to the procedural requirements of paragraphs (1) through (3) of section 7(I) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839(I) (1) through (3)), except that the hearing officer shall, unless the hearing officer becomes unavailable to the agency, make a recommended decision to the Administrator that states the hearing officer's findings and conclusions, and the reasons or basis thereof, on all material issues of fact, law, or discretion presented on the record; and

(III) make a determination, setting forth the reasons for reaching any findings and conclusions which may differ from those of the hearing officer, based on the hearing record, consideration of the hearing officer's recommended decision, section 211 and this section, as amended by the Energy Policy Act of 1992, and the provisions of law as preserved in this section; and

(B) if application is made to the Commission under section 211 for transmission service under terms and conditions different than those offered by the Administrator, or following the denial of a request for transmission service by the Administrator, and such application is filed within 60 days of the Administrator's final determination and in accordance with Commission procedures, the Commission shall--

(i) in the event the Administrator has conducted a hearing as herein provided for (I) accord parties to the Administrator's hearing the opportunity to offer for the Commission record materials excluded by the Administrator from the hearing record, (II) accord such parties the opportunity to submit for the Commission record comments on appropriate terms and conditions, (III) afford those parties the opportunity for a hearing if and to the extent that the Commission finds the Administrator's hearing record to be inadequate to support a decision by the Commission, and (IV) establish terms and conditions for or deny transmission service based on the Administrator's hearing record, the Commission record, section 211 and this section, as amended by the Energy Policy Act of 1992, and the provisions of law as preserved in this section, or

(ii) in the event the Administrator has not conducted a hearing as herein provided for, determine whether to issue an order for transmission service in accordance with section 211 and this section, including providing the opportunity for a hearing.

(3) Notwithstanding those provisions of section 313(b) of this Act (16 U.S.C. 825I) which designate the court in which review may be obtained, any party to a proceeding concerning transmission service sought to be furnished by the Administrator of the Bonneville Power Administration seeking review of an order issued by the Commission in such proceeding shall obtain a review of such order in the United States Court of Appeals for the Pacific Northwest, as that region is defined by section 3(14) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839a(14)).

(4) To the extent the Administrator of the Bonneville Power Administration cannot be required under section 211, as a result of the Administrator's other statutory mandates, either to (A) provide transmission service to an applicant which the Commission would otherwise order, or (B) provide such service under rates, terms, and conditions which the Commission would otherwise require, the applicant shall not be required to provide similar transmission services to the Administrator or to provide such services under similar rates, terms, and conditions.

(5) The Commission shall not issue any order under section 210, section 211, this section, or section 213 requiring the Administrator of the Bonneville Power Administration to provide transmission service if such an order would impair the Administrator's ability to provide such transmission service to the Administrator's power and transmission customers in the Pacific Northwest, as that region is defined in section 3(14) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839a(14)), as is needed to assure adequate and reliable service to loads in that region.

(j) EQUITABILITY WITHIN TERRITORY RESTRICTED ELECTRIC SYSTEMS.--With respect to an electric utility which is prohibited by Federal law from being a source of power supply, either directly or through a distributor of its electric energy, outside an area set forth in such law, no order issued under section 211 may require such electric utility (or a distributor of such electric utility) to provide transmission services to another entity if the electric energy to be transmitted will be consumed within the area set forth in such Federal law, unless the order is in furtherance of a sale of electric energy to that electric utility: Provided, however, That the foregoing provision shall not apply to any area served at retail by an electric transmission system which was such a distributor on the date of enactment of this subsection and which before October 1, 1991, gave its notice of termination under its power supply contract with such electric utility.

(k) ERCOT UTILITIES.--

(1) RATES.--Any order under section 211 requiring provision of transmission services in whole or in part within ERCOT shall provide that any ERCOT utility which is not a public utility and the transmission facilities of which are actually used for such transmission service is entitled to receive compensation based, insofar as practicable and consistent with subsection (a), on the transmission ratemaking methodology used by the Public Utility Commission of Texas.

(2) DEFINITIONS.--For purposes of this subsection--

(A) the term "ERCOT" means the Electric Reliability Council of Texas; and

(B) the term "ERCOT utility" means a transmitting utility which is a member of ERCOT.

(16 U.S.C. 824k)



Endnotes

232. Section 721(4) of P.L. 102-486 struck paragraphs (1), (3), and (4) without redesignating paragraph (2).







File last modified: August 6, 1998

Contact:
Contact Name
skanhouwa@eia.doe.gov
Phone: (202) 426-1257
If you are having technical problems with this site, please contact the EIA Webmaster at wmaster@eia.doe.gov